𝐈𝐧𝐭𝐫𝐨𝐝𝐮𝐜𝐭𝐢𝐨𝐧

A large-scale grid-connected solar photovoltaic system requires efficient maximum power extraction, stable DC-link voltage control, proper inverter synchronization, and good grid-current quality.



30 MW Grid Connected PV System in MATLAB
₹12,000.00₹6,000.00
Buy Now


This MATLAB/Simulink model demonstrates a 30 MW grid-connected solar PV system using a Perturb and Observe (P&O) Maximum Power Point Tracking (MPPT) algorithm.

The complete system includes:

  • 30 MW solar PV array

  • DC–DC boost converter

  • P&O MPPT controller

  • DC-link capacitor

  • Three-phase grid-connected inverter

  • Voltage and current control loops

  • Synchronous reference frame control

  • Three-phase grid interface

  • Grid-current harmonic analysis

  • Irradiance variation testing

The simulation shows how the PV system extracts maximum available solar power and transfers it to an 11 kV, 50 Hz utility grid.

𝐒𝐲𝐬𝐭𝐞𝐦 𝐎𝐯𝐞𝐫𝐯𝐢𝐞𝐰

The power flow of the system is:

Solar PV Array → Boost Converter → DC Link → Three-Phase Inverter → Filter → Utility Grid

The boost converter performs maximum power point tracking, while the inverter converts the DC power into three-phase AC power suitable for grid integration.

Main System Parameters

Parameter

Value

PV system rated power

30 MW

PV operating voltage near MPP

Approximately 5000 V

PV current at full irradiance

Approximately 6000 A

DC-link reference voltage

Approximately 20 kV

Grid voltage

11 kV

Grid frequency

50 Hz

Maximum irradiance

1000 W/m²

Reduced irradiance

100 W/m²

MPPT technique

P&O MPPT

Power converter

DC–DC Boost Converter

Grid converter

Three-Phase Inverter

𝐌𝐚𝐢𝐧 𝐂𝐨𝐦𝐩𝐨𝐧𝐞𝐧𝐭𝐬

1. Solar PV Array

The PV array acts as the main renewable energy source.

Its output mainly depends on:

  • Solar irradiance

  • PV operating voltage

  • PV operating current

  • PV array configuration

A PV array has a nonlinear power-voltage characteristic. Therefore, simply connecting the PV array to a converter does not guarantee maximum power extraction.

An MPPT controller is required to continuously identify the operating point where the available PV power is maximum.

2. DC–DC Boost Converter

The PV array is connected to the DC link through a boost converter.

The boost converter provides two important functions:

  • Controls the operating voltage of the PV array

  • Supports maximum power extraction using the MPPT duty cycle

Important factors considered while designing a high-power boost converter include:

  • PV array rated power

  • PV terminal voltage

  • Required DC-link voltage

  • Switching frequency

  • Permissible inductor-current ripple

  • Permissible capacitor-voltage ripple

The calculated duty cycle from the P&O MPPT controller is converted into switching pulses for the boost converter.

𝐏&𝐎 𝐌𝐏𝐏𝐓 𝐂𝐨𝐧𝐭𝐫𝐨𝐥

The Perturb and Observe method is one of the commonly used conventional MPPT techniques for photovoltaic systems.

The controller continuously observes changes in:

  • PV voltage

  • PV power

It compares the present operating condition with the previous operating condition and decides whether the PV operating voltage should be increased or decreased.

Basic P&O Decision Process

PV Power Change

PV Voltage Change

Required PV Voltage Movement

Increasing

Increasing

Increase PV voltage

Decreasing

Decreasing

Increase PV voltage

Decreasing

Increasing

Decrease PV voltage

Increasing

Decreasing

Decrease PV voltage

For a boost converter, the required PV-voltage adjustment is achieved by changing the converter duty cycle.

The MPPT controller therefore keeps moving the operating point toward the maximum power region of the PV array.

𝐏&𝐎 𝐌𝐏𝐏𝐓 𝐏𝐫𝐨𝐜𝐞𝐬𝐬

The MPPT controller performs the following operations continuously:

  • Measures the instantaneous PV voltage

  • Measures the instantaneous PV current

  • Determines the corresponding PV power

  • Compares present and previous operating conditions

  • Identifies the direction of maximum power

  • Adjusts the boost-converter duty cycle

  • Limits the duty cycle between predefined minimum and maximum values

  • Updates the previous operating values

  • Repeats the process during the simulation

Important controller settings include:

  • Initial duty cycle

  • Minimum duty cycle

  • Maximum duty cycle

  • Small duty-cycle perturbation step

This continuous process allows the PV system to follow the changing maximum power point when solar irradiance changes.

𝐓𝐡𝐫𝐞𝐞-𝐏𝐡𝐚𝐬𝐞 𝐆𝐫𝐢𝐝-𝐂𝐨𝐧𝐧𝐞𝐜𝐭𝐞𝐝 𝐈𝐧𝐯𝐞𝐫𝐭𝐞𝐫

The DC power obtained from the PV and boost converter cannot be directly supplied to the AC grid.

A three-phase voltage source inverter converts the DC power into AC power.

The inverter control system performs two major functions:

  1. DC-link voltage regulation

  2. Grid-current control

The generated AC power is transferred to the 11 kV utility grid through the grid-side interface and filter inductance.

𝐂𝐨𝐧𝐭𝐫𝐨𝐥 𝐒𝐭𝐫𝐚𝐭𝐞𝐠𝐲

DC-Link Voltage Control

The DC-link voltage is maintained at approximately 20 kV.

The measured DC-link voltage is compared with its reference value.

The resulting control signal is processed by a controller to generate the required d-axis current reference.

This outer voltage-control loop helps maintain a stable DC bus even when the PV-generated power changes.

Grid Current Control

The measured three-phase grid currents are transformed into synchronous rotating reference-frame components.

The controller mainly works with:

  • d-axis current

  • q-axis current

The d-axis component is primarily associated with active-power transfer.

The q-axis reference is maintained around zero because the simulation focuses mainly on transferring real power from the PV system to the grid.

The controlled signals are then transformed back into three-phase quantities and used to generate the switching commands for the inverter.

𝐒𝐲𝐧𝐜𝐡𝐫𝐨𝐧𝐨𝐮𝐬 𝐑𝐞𝐟𝐞𝐫𝐞𝐧𝐜𝐞 𝐅𝐫𝐚𝐦𝐞 𝐂𝐨𝐧𝐭𝐫𝐨𝐥

The grid-current controller uses a synchronous reference frame approach.

The control process consists of:

  • Measuring three-phase grid current

  • Converting three-phase quantities into rotating-frame quantities

  • Comparing actual currents with reference currents

  • Processing the current errors through controllers

  • Generating inverter voltage-control references

  • Converting them back into three-phase signals

  • Generating six switching pulses for the inverter

This control structure allows independent regulation of active and reactive current components.

𝐈𝐫𝐫𝐚𝐝𝐢𝐚𝐧𝐜𝐞 𝐕𝐚𝐫𝐢𝐚𝐭𝐢𝐨𝐧 𝐓𝐞𝐬𝐭

The system is tested under a large change in solar irradiance.

Irradiance Test Conditions

Operating Condition

Irradiance

High solar condition

1000 W/m²

Low solar condition

100 W/m²

High irradiance restored

1000 W/m²

The irradiance is changed during the simulation to observe the dynamic performance of:

  • PV voltage

  • PV current

  • PV power

  • DC-link voltage

  • Grid current

  • Inverter current

  • Grid power

  • Inverter power

This test demonstrates whether the MPPT and grid controller can respond correctly to rapid solar-power variations.

𝐖𝐨𝐫𝐤𝐢𝐧𝐠 𝐏𝐫𝐨𝐜𝐞𝐬𝐬

At 1000 W/m²

Under high irradiance:

  • PV voltage remains close to 5000 V

  • PV current reaches approximately 6000 A

  • PV output power reaches approximately 30 MW

  • Grid and inverter currents remain sinusoidal

  • The generated PV power is delivered to the utility grid

  • DC-link voltage remains close to its reference value

When Irradiance Drops to 100 W/m²

When solar irradiance decreases:

  • PV current decreases significantly

  • PV output power decreases

  • Grid current decreases

  • Inverter current decreases

  • Grid active power decreases

  • Inverter active power decreases

  • MPPT continues adjusting the PV operating point

  • DC-link voltage regulation remains active

The reduction in current is expected because PV current is strongly influenced by solar irradiance.

When Irradiance Returns to 1000 W/m²

When the irradiance increases again:

  • PV current rises

  • PV power returns toward its rated operating region

  • Grid current increases

  • Inverter current increases

  • Grid power increases

  • Inverter power increases

  • PV voltage returns close to the maximum-power operating voltage

The P&O MPPT controller automatically tracks the changed maximum power point.

𝐒𝐢𝐦𝐮𝐥𝐚𝐭𝐢𝐨𝐧 𝐑𝐞𝐬𝐮𝐥𝐭𝐬

The simulation monitors several important signals.

PV-Side Measurements

  • Solar irradiance

  • PV voltage

  • PV current

  • PV output power

At full irradiance, the system produces approximately:

Quantity

Approximate Result

Irradiance

1000 W/m²

PV voltage

5000 V

PV current

6000 A

PV power

30 MW

Grid and Inverter Measurements

The simulation also monitors:

  • Three-phase grid voltage

  • Three-phase grid current

  • Inverter voltage

  • Inverter current

  • Grid active power

  • Inverter active power

The current waveforms remain approximately sinusoidal during both high- and low-irradiance operating conditions.

DC-Link Performance

The DC-link voltage is regulated close to:

20 kV

Small variations can occur during rapid irradiance transitions because the available PV power changes suddenly.

The voltage controller acts to restore and maintain the required DC-link operating level.

𝐂𝐮𝐫𝐫𝐞𝐧𝐭 𝐓𝐇𝐃 𝐀𝐧𝐚𝐥𝐲𝐬𝐢𝐬

Grid-current quality is an important consideration in grid-connected power converters.

FFT analysis is performed at different simulation instants.

Measured THD Values

Analysis Time

Current THD

0.5 s

0.81%

1.2 s

0.86%

1.8 s

0.47%

Similar harmonic performance is observed for the inverter current.

These values remain well below the 5% level considered in the simulation assessment, indicating low current waveform distortion during the tested operating conditions.

𝐌𝐏𝐏𝐓 𝐑𝐞𝐬𝐩𝐨𝐧𝐬𝐞 𝐔𝐧𝐝𝐞𝐫 𝐕𝐚𝐫𝐲𝐢𝐧𝐠 𝐒𝐨𝐥𝐚𝐫 𝐂𝐨𝐧𝐝𝐢𝐭𝐢𝐨𝐧𝐬

One of the important observations from the simulation is the relationship between irradiance and PV power.

When irradiance decreases:

Irradiance ↓ → PV Current ↓ → PV Power ↓ → Grid Power ↓

When irradiance increases:

Irradiance ↑ → PV Current ↑ → PV Power ↑ → Grid Power ↑

Throughout these variations, the P&O controller continuously adjusts the boost-converter switching duty cycle to keep the PV array close to its maximum available power point.

𝐊𝐞𝐲 𝐅𝐞𝐚𝐭𝐮𝐫𝐞𝐬

  • 30 MW utility-scale solar PV system

  • P&O MPPT for maximum power extraction

  • High-power DC–DC boost converter

  • Approximately 20 kV DC-link

  • Three-phase voltage source inverter

  • 11 kV, 50 Hz grid connection

  • DC-link voltage regulation

  • d-q current control

  • Active-power transfer to the utility grid

  • Zero reactive-current reference operation

  • Dynamic irradiance variation

  • PV voltage, current and power monitoring

  • Grid voltage and current monitoring

  • Inverter voltage and current monitoring

  • Grid and inverter power measurement

  • FFT-based current THD analysis

  • Low current harmonic distortion during the simulated conditions

𝐀𝐩𝐩𝐥𝐢𝐜𝐚𝐭𝐢𝐨𝐧𝐬

This MATLAB/Simulink model is useful for studying:

  • Utility-scale solar PV generation

  • Grid-connected renewable energy systems

  • Solar power conversion

  • Maximum power point tracking

  • P&O MPPT operation

  • High-power DC–DC converters

  • Three-phase grid-connected inverters

  • DC-link voltage control

  • Synchronous reference frame control

  • Active and reactive current control

  • Solar irradiance variation

  • Power-quality analysis

  • Grid-current harmonic analysis

  • Renewable-energy integration

It is suitable for students, researchers and power-electronics engineers who want to understand the complete operation of a large-scale grid-connected PV system.

𝐖𝐡𝐚𝐭 𝐘𝐨𝐮 𝐂𝐚𝐧 𝐋𝐞𝐚𝐫𝐧 𝐟𝐫𝐨𝐦 𝐓𝐡𝐢𝐬 𝐒𝐢𝐦𝐮𝐥𝐚𝐭𝐢𝐨𝐧

After studying this model, you can understand:

  • Why MPPT is necessary for a PV array

  • How the P&O algorithm tracks maximum PV power

  • How a boost converter controls the PV operating point

  • How DC power is converted into three-phase AC power

  • How the DC-link voltage is regulated

  • How d-q current control is applied to a grid-connected inverter

  • How solar irradiance affects PV current and power

  • How generated PV power is transferred to the grid

  • How grid-current THD can be analyzed using FFT tools

  • How a large-scale PV plant responds to changing environmental conditions

𝐂𝐨𝐧𝐜𝐥𝐮𝐬𝐢𝐨𝐧

The MATLAB Simulation of 30 MW Grid Connected Solar PV System with P&O MPPT demonstrates the complete power conversion and control process from solar generation to utility-grid integration.

The P&O MPPT controller continuously adjusts the PV operating point to extract the available maximum power. The boost converter interfaces the PV array with the DC link, while the three-phase inverter transfers the generated active power to the 11 kV grid.

Under changing irradiance conditions, the simulation shows corresponding changes in PV current, PV power, inverter current and grid power while maintaining DC-link regulation. The measured current THD values of approximately 0.47% to 0.86% during the analyzed intervals indicate low harmonic distortion in the simulated current waveforms.

Overall, the model provides a clear platform for understanding large-scale solar PV generation, P&O MPPT, DC–DC conversion, grid-connected inverter control and power-quality analysis in MATLAB/Simulink.


Comments


bottom of page